Current location:Home >> News center
Designed by EMS of Canada, manufactured and installed by songda, the grain self–unloading was successfully loaded and shipped to zhenhua shipyard for final assembly |
Publisher:admin Time:2019/7/30 16:16:02 Click:2053 |
Prev:The Panama Cobre Project, which was overall contracted by China National Chemical Engineering Third Construction Company CO., Ltd and produced by Wuxi Songda Heavy Machinery Co., Ltd Next:Warm congratulations to ShangRao Golden Power Plant on the successful delivery of 800 tons/h mobile stacker |